Accelerator

Where a specification becomes a running system

A published specification is not the same as a working connection. The accelerator carries that gap: reference code to build from, a sandbox to test in, and hands-on support until a new participant can stand on its own.

IMPACTS
0utilities live, against an outlook of one
0smart meters' data exchanged
0bilateral agreements needed
0technology providers onboarded
0use cases specified, five through Stage 1
0DISCOMs assessed for readiness
0pages of open technical reference
0+meetings, 150+ high-level
LIVE IN IES ACCELERATOR

Plug in an IES adapter and unlock use cases

Once a utility connects through an IES adapter, each further use case is a configuration, not a fresh build. Hover or tap a marker to see who, and what went live.

Hover or tap a pin for that state's pilot company and use cases.
Boundary data: 2011 census district geometry, dissolved to state level; public sources, via udit-001/india-maps-data.

UTTAR PRADESH

Paschimanchal Vidyut Vitran Nigam Limited (PVVNL)

What went live

Passport and Meter Digest in build. 100 meters shared to an analytics provider. Proposed a new use case, outage publication, from data it already held.

Connector runningIdentity resolvableDirectory entry presentRecord or exchange completedIndependently checked by counterpart
WHERE EACH USE CASE STANDS

3 Stages of IES

Every use case follows the same graduated pathway. Stage 1: Validation tests the specification with two to ten utilities under controlled conditions. Stage 2: Calibrated deployment puts it live with real consumers in two to four States. Stage 3: Scale takes it national.

GATEGATE
Stage 1 · ValidationStage 2 · Calibrated deploymentStage 3 · Scale
Peer-to-Peer Energy Exchange
validation completemodel regulation at the Forum of Regulators
Smart meter data exchange
Stage 1 cleared
Consumer Energy Passport
Stage 1 cleared
Consumer Meter Digest
Stage 1 cleared
DER visibility
Stage 1 cleared
DISCOM regulatory filing
specified; in build
Tariff intelligence
specified; first policy pack scoped
Outage notification
specified

next cohorts enter here:
bootcamp, 30-day build,
live demonstration

A use case advances only when gate criteria are met and next-stage funding is committed. Five States were already reached in Stage 1 itself.

WHAT THE ACCELERATOR PROVIDES

Everything between a spec and a running system

Hover a card to see what each one covers.

Reference Implementations

Reference Implementations

Working deployments that show a specification turned into running code. A new participant starts from that, not from a blank document.

Conformance Testing & Tools

Conformance Testing & Tools

Automated test suites that check whether a system correctly implements the specifications: the foundation of certification. A system that passes can be trusted to work with others.

The Sandbox

The Sandbox

A controlled environment where use cases are proven with real or synthetic data before going live. Not a disposable test bed: it grows into staging and then production infrastructure as a use case matures.

Technical Support & Advisory

Technical Support & Advisory

Hands-on help with architecture, integration and specification questions for anyone implementing IES for the first time.

Training & Capacity Building

Training & Capacity Building

In the early stages, the core team supports directly. As adoption grows, certified partners extend that reach.

Developer Ecosystem

Developer Ecosystem

Dev kits, documentation, sample code, request collections, a public discussion board and an issue tracker, so a developer can go from nothing to a working exchange without a meeting.

HOW THE SANDBOX IS BUILT

Not a central platform

Each participant keeps control of its own data and systems. Every shared component is owned by its custodian and found through the shared directory. Providers move through four steps:

1

Onboarding

Sandbox credentials, documentation, dev kit and sample collections issued.

2

Co-build

Bootcamps and working sessions alongside programme engineers.

3

Validation

End-to-end transactions with real or mock counterparties, producing signed receipts. Conformance tests run continuously, not as a one-time gate.

4

Calibrated Deployment

Graduation into live rollout with participating utilities, in bounded corridors, before scaling.

START BUILDING

Specifications, schemas and onboarding pathways: open, versioned, and ready today

Freely published Every version kept Reviewed in public

Every schema submission becomes a public issue, reviewed by the Architecture Group, and merged as a canonical, versioned schema.

IES Accelerator is not a phase; it is a permanent function.